Which phase directly follows site selection in the construction process?

Prepare for the Construction Checkpoint Test. Hone your skills with quizzes and multiple choice questions, each with explanations and tips. Get ready for your exam now!

The phase that directly follows site selection in the construction process is design development. This stage is crucial as it involves taking the selected site and beginning to conceptualize the physical layout and architectural details of the project. During design development, architects and engineers work to create detailed plans that illustrate how the project will take shape, ensuring alignment with zoning laws, site characteristics, and the overall vision of the project.

Design development focuses on refining aspects of the project such as space allocation, material choices, and aesthetics, based on the criteria established in the initial stages of planning. This phase is essential for translating the initial ideas into practical and feasible construction drawings and specifications that guide later phases of the project, including construction planning and actual building.

The other phases mentioned, while important, occur after the design development has been established. For instance, material selection is often based on the decisions made during design development, as is construction planning, which requires detailed designs to determine logistics and scheduling. Final inspections are conducted after construction has been completed, making them the last phase rather than a sequential part of the process immediately following site selection.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy